What we are building

​​The New Hospital Bispebjerg is being built in several stages, combining new construction with renovation of historic buildings. Each part of the project is completed and opened gradually, leading up to the full hospital complex. Get an overview of the projects here.

​​​​​

​The new General Hospital will bring together key hospital functions – including the ​​Emergency Department, operating theatres, Intensive Care, Imaging, and new Women and Children's Departments – in a modern, patient-focused setting connected to the surrounding park.

Facts​

  • Size: approx. 69,000 m²
  • Six ward towers above a three-level base
  • Around 460 single-bed rooms with private bathrooms and garden views
  • Central foyer with natural light and easy wayfinding
  • Arrival plaza with 125 underground parking spaces
  • Expected completion: 2030–2032

​Alongside the construction of the new General Hospital Building (Akuthuset), extensive reno-vation and restoration work is being carried out in architect Martin Nyrop’s heritage-protected pavilion buildings. With great respect for the original design, the historic pavilions will be preserved as the hospital’s heritage quarter.

​​​​Facts

  • Renovated area: approx. 12,000 m² ​
  • Functional upgrades and adaptations included
  • Budget: approx. DKK 40 million
  • Construction period: 2016–2027

The new Education Centre at Bispebjerg Hospital — known as Fælleshuset — is a modern hub for learning, collaboration, and community. It brings together clinical practice, research, and education, offering inspiring spaces for training, meetings, and professional development across disciplines.

Built in reused red bricks and designed with strong sustainability principles, the building blends harmoniously with the historic hospital architecture while reducing environmental impact dur-ing construction.

Facts

  • Opened in 2025
  • Location: Nielsine Nielsens Vej 12, Bispebjerg Hospital
  • Size: 2,670 m²
  • Facilities: Auditorium (200 seats), 14 classrooms, hall (100 seats), open atrium
  • Architect: Ebbe Wæhrens, BBP Arkitekter
  • Artistic design: Malene Bach
  • Sustainability: Reused bricks, CLT structure, low cement use
  • Parking: Two-level basement with 47 spaces
  • Built by: Skou Gruppen A/S with BBP Arkitekter and Dominia Engineers
  • Completed by: Region Hovedstaden, Center for Ejendomme

The historic, protected patient gardens at Bispebjerg Hospital have been beautifully restored as healing oases — just as originally envisioned in 1913 by landscape architect Edward Glæsel. The gardens were named Copenhagen’s Best Urban Space in 2022.

Patients, visitors, and staff can now enjoy flowering magnolia trees, peaceful spaces for re-flection, and accessible paths that allow even bedridden patients to experience nature. The renovation strengthens biodiversity and resilience while restoring many of the gardens’ original plant varieties.

Fact​s

  • Opened in 2022
  • Original gardens designed in 1913 by Edward Glæsel
  • Restored with historical inspiration and modern accessibility
  • Step-free access for patients, including palliative care
  • Enhanced biodiversity with new trees, shrubs, and flowering plants
  • Awarded Copenhagen’s Best Urban Space 2022

​​​​The Laboratory and Logistics Building provides state-of-the-art facilities for research, analysis, and hospital logistics. It brings together laboratories, storage and logistics areas, and shared research spaces to support efficient operations and scientific collaboration.

Facts

  • Opened in 2018
  • Area: approx. 9,800 m²
  • Budget: DKK 204 million
  • Construction period: 2016–2018
  • Client advisors: Kuben, Balslev, and Arkitema
  • Design and engineering consultants: Mikkelsen Arkitekter, WHR Architects, and NIRAS ​

The Technical Building houses Denmark’s largest ATES (Aquifer Thermal Energy Storage) system for underground energy ​​​storage. It also accommodates the hospital’s new emergency power generators.

Facts​

Technical Build​​​ing

  • Opened in 2018
  • Area: approx. 530 m²
  • Consultant: INGENIØR’NE
  • Construction period: 2017–2018

ATES Sys​​tem

  • Produces and stores thermal energy underground to supply heating and cooling for both the hospital and the psychiatric facilities
  • Consultant: EnerKon
  • Construction period: 2017–2019

Eme​​rgency Power System

  • Includes three new backup generators that supplement the hospital’s existing three units
  • Consultant: Balslev
  • Construction period: 2017–2018

The first completed project in the hospital expansion is the new multi-storey parking facility, located in the northwestern corner of the site facing Tuborgvej. Opened in November 2015, the building provides convenient access for patients, visitors, and staff.

Fa​​cts

  • Opened in 2015.
  • Capacity: approx. 560 parking spaces, Including 5 disabled spaces, 10 motorcycle spaces, and 4 E.ON charging stations
  • Height: 24 metres, 8 levels
  • Two rooftop terraces with city views
  • 200 m² of solar panels supply about 20% of energy use
  • Budget: DKK 87 million
  • Client advisor: Bascon
  • Design and engineering: 5E Byg, Årstiderne Arkitekter, and COWI
  • Construction period: Late 2014 – November 2015